FOR HUMANS
You shouldn't need a PhD to use DeFi.
Moving $5K from Ethereum to a yield position on Base takes 4 interfaces, 3 approvals, and 20 minutes of research. Every action is a separate app, a separate risk, a separate signature. The power is there — the access layer isn't.





